MIL-DTL-62460E
e. With steer control lever in zero steer position, slowly increase power to the input
shaft in the CW direction of rotation while using the dynamometers to load the
output shaft(s). Increase power until the input torque and input speed conform to
one of the six test conditions of table VI. Measure output torques and speeds for
conformance to table VI. Repeat the above procedures for each of the other five
test conditions of table VI. For the four test conditions of table VI that require
total load applied to only one output, use only one of the two dynamometers to
apply load, disconnect the other dynamometer.
f. Repeat above steps for CCW (reverse) direction of rotation.
4.6.3.10 Output performance, high speed and high power. To determine conformance to
3.4.17, apply the procedures of 4.6.3.9 except apply input torque and speed per table VII.
Measure output torques and speeds for conformance to table VII.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as
specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed
by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain
requisite packaging requirements. Packaging requirements are maintained by the Inventory
Control Point's packaging activity within the Military Department or Defense Agency, or within
the Military Department's System Command. Packaging data retrieval is available from the
managing Military Department's or Defense Agency's automated packaging files, CD-ROM
products, or by contacting the responsible packaging activity.
6. NOTES
(This section contains information of a general or explanatory nature which may be
helpful, but is not mandatory.)
6.1 Intended use. This specification covers a steer unit, capable of performing steering
and braking functions, for the Armored Combat Earthmover (M9 ACE). Since the design of this
steer unit is solely configured for use on the M9 ACE, thereby having no commercial equivalent,
this item is military unique.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. Title, number, and revision letter of the applicable engineering drawing
(see 2.2.1).
c. If first article inspection is required (see 3.1).
d. If operating fluid and test oil are other than as specified (see 3.2.1 and 4.5.1).
17