MIL-DTL-62460E
TABLE IX. Sampling plan for conformance.
Conformance sampling plan
Sample size
Inspection
Examination
lot size
Major
Minor
2 to 8
*
5
9 to 15
13
5
16 to 25
13
5
26 to 50
13
5
51 to 90
13
7
91 to 150
13
11
151 to 280
20
13
281 to 500
29
16
501 to 1200
34
19
1201 to 3200
42
23
3201 to 10 000
50
29
10 001 to 35 000
60
35
35 001 to 150 000
74
40
150 001 to 500 000
90
40
500 001 and over
102
40
4.4 Examination. Each steer unit shall be examined for compliance with the requirements
specified in 3.3.1, 3.3.2, and 3.5 through 3.7. Any redesign or modification of the contractor's
standard product to comply with specified requirements, or any necessary redesign or
modification following failure to meet the specified requirements shall receive particular attention
for adequacy and suitability. This element of inspection shall encompass all visual examinations
and dimensional measurements. Noncompliance with any specified requirements or presence of
one or more defects preventing or lessening maximum efficiency shall constitute cause for
rejection.
4.5 Inspection conditions. Unless otherwise specified, all inspections shall be performed
in accordance with the test conditions specified in 4.5.1 through 4.5.4.3.
4.5.1 Inspection conditions. Unless otherwise specified, all inspections shall be performed
in accordance with the test conditions specified in 4.5.1 through 4.5.4.3.
4.5.2 Test oil temperature. Except as otherwise specified, the temperature of the test oil
shall be maintained at 66 degrees Celsius (°C) to 93°C.
4.5.3 Test equipment. The following test equipment will be required for performance of
the tests specified herein.
11
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business