MIL-A-62463B(AT)
TABLE VI. Classification of tests. - cont.
First
Quality conformance
Title
Requirement
Tests
article
Acceptance Control
(100%)
Port 1 wheel valve
3e
4.6.13
X
X
O-ring leakage
2-3 wheel valve 1 kg
3f
4.6.14
X
X
Port 4 wheel valve
3g
3.6.14
X
X
O-ring leakage
Shock check valve 1 kg
4
4.6.10
X
X
Level "Fill" valve
5a
4.6.11
X
X
seat leakage
Level "Drain" valve
5b
4.6.14
X
X
seat leakage
Level "Fill" valve
6a
4.6.14
X
X
stem leakage
Level "Drain" valve
6b
4.6.10
X
X
stem leakage
Combined leakage
7
4.6.15
X
X
Relief valve leakage
8a
4.6.17
X
X
Relief valve reseat leakage
8b
4.6.18
X
X
Relief valve setting
3.4.2.2
4.6.16
X
X
Leveling "Fill" valve close
3.4.2.3.1
4.6.19 22
X
X
Leveling "Drain" valve open
3.4.2.3.2
4.6.19 22
X
X
Performance (Type II)
Table III
Item no.
Vane seal leakage
1
4.6.7.1
X
X
Piston ring leakage
2
4.6.7.2
X
X
Combined leakage
3
4.6.8
X
X
Temperature extremes
3.4.4
4.6.23
X
performance
4.6 Methods of inspection. The following test procedures, or equivalent procedures acceptable
to the Government, shall be applied to determine conformance to requirements of 3.4. Prior to
performing the following tests, preparation for testing in accordance with 4.3.4 shall have been
accomplished to provide a proper setup.
4.6.1 Proof pressure. To determine conformance to 3.4.1.1:
a. Position shaft at midtravel position (36° ± 20° rotation form full rotation position).
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business