MIL-DTL-11891G(AT)
APPENDIX B
B.3.21.2 Hardware. Hardware required for failure analysis shall be provided to the
Preparing Activity upon request.
B.3.22 Vehicle disposition. Upon completion of the test and inspections, the vehicle shall
be returned to the original pretest condition. Vehicle disposition instructions will be issued by the
Preparing Activity.
B.3.23 Documentation/test reporting/photographic coverage. Any test incidents related
to track, suspension and/or drive train components shall be documented on AMC Form 2134,
Test Incident Report (TIR) or comparable test reporting document. The test site shall provide
these reports to the Preparing Activity as they are generated. Each TIR or other test reporting
document shall include as a minimum the following:
a.
Description of failed component/part (noun).
b.
Mileage track has endured.
c.
Code/Serial number identification of failed component and code/serial number of
replacement component.
d.
Vehicle registration number.
e.
Date of incident.
f.
Description of incident. Description shall be detailed and include cause, if evident.
g.
Test course where incident occurred, if known.
h.
Estimated speed of vehicle when incident occurred.
i.
Test environment at time of incident.
j.
Disposition of failed part. Hold and tag failed part.
k.
Test report number (beginning with number 1, continuing in chronological order.)
Supplements to a specific number shall be identified with a letter (i.e., T0001A).
l.
Authorized signature.
B.3.23.1 Track incidents. All track incidents determined to be major (that is, track
throws, misguides, etc.) shall be immediately reported to the Preparing Activity.
59
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business