MIL-DTL-11891G(AT)
APPENDIX C
i.
Test environment at time of incident.
j.
Disposition of failed part. Hold and tag failed part.
k.
Test report number (beginning with number 1, continuing in chronological order).
Supplements to a specific number shall be identified with a letter (i.e., T0001A).
l.
Authorized signature.
C.3.22.1 Track incidents. All track incidents determined to be major (that is, track
throws, misguides, etc.) shall be immediately reported to the Preparing Activity.
C.3.23 Final report. The test site shall prepare a final technical report at the completion
of testing. The report shall include as a minimum the following:
a.
Data collected. Include copies of TIRs for track related failures.
b.
Summary of test findings and conclusions.
c.
Photographs, tables, and charts to reflect test findings and conclusions.
d.
If more than one contractor is attempting qualification testing at one time, test
results shall be grouped by contractor.
C.3.24 Photographic coverage. The test site shall furnish color photographic coverage of
all significant test events to include, as a minimum, track throw or misguide damage (vehicle and
track system), broken or bent center guides, sprocket damaged shoes, and broken pins.
C.3.24.1 Applicable information. Together with the photographic coverage, applicable
information (manufacturer, serial number, test course, mileage sustained, etc.) shall be recorded
and accompany the photographs. This data is to be included in the final report.
C.3.25 Distribution of reports. The distribution of test incident reports and final reports
shall be as specified by the Preparing Activity.
75
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business